IT Checklist for Moving Office

Plan internet, phones, networks and equipment before moving day, with checks to complete before staff start work at the new office.

By Adroit Support · Published 1 November 2026

An office move involves more than unplugging computers and reconnecting them at the new address. Internet services, phone numbers, cabling and access to business systems all need to be ready when your team arrives.

Start the IT planning as soon as you know which premises you are considering. Connection work, building access and fit-out requirements can affect the move date. Give each task an owner and confirm what is ready before committing to the changeover.

1. Check the new office before the fit-out is finalised

Walk through the premises with your floor plan and the people responsible for IT and fit-out work. Establish where staff, printers, meeting rooms and network equipment will go.

  • Internet connection: check service availability at the exact tenancy or suite, the connection point and any installation work required.
  • Data cabling: check which outlets work, where they terminate and whether there are enough for the proposed layout.
  • Power: arrange suitable outlets for desks, meeting rooms and network equipment with the relevant trades.
  • Network equipment: identify a secure, accessible location with appropriate ventilation for the firewall, switches and any servers.
  • Wireless coverage: plan access point locations around the layout, walls and expected usage. A router in one corner may not cover the office.
  • Building access: confirm landlord approvals, communications-room access, delivery arrangements and when technicians can attend.

Existing outlets and equipment are not proof that the new tenancy has a working internet service. Arrange testing and confirm responsibilities with your provider, landlord and fit-out team.

2. Order internet and plan a fallback

Ask your internet provider what can be supplied at the new address, what work is required and when the service can be activated. Include any static IP addresses, remote access arrangements or applications that depend on the current connection.

Where practical, have the new service installed and tested while the old office is still operating. Agree when the old service can be disconnected after the move and check any contract or notice requirements.

Discuss a temporary connection if the main service is delayed. Mobile broadband may be an option, but coverage, capacity and compatibility need testing at the premises. It should not be assumed to support every business system.

For nbn services, nbn's business relocation guidance explains the arrangements to discuss with your provider. Confirm which supplied equipment stays at the old premises and which equipment you need to move.

3. Confirm what happens to your business phone numbers

Check how calls are delivered today and what needs to change at the new office. A cloud phone system may still need changes to handsets, network settings, call routing and the registered service address.

If you want to retain existing numbers, ask your phone provider to confirm the options and process before cancelling anything. Agree the changeover date, temporary forwarding if available and a way to test incoming and outgoing calls. The ACMA provides guidance on keeping or transferring phone numbers.

List any other services that use the connection, including alarms, intercoms, payment terminals and specialist equipment. Have the relevant supplier confirm what is needed at the new site.

4. Make an equipment list and check system dependencies

Record what is moving, being replaced, staying behind or being returned to a supplier. Include computers, monitors, docks, printers, servers, storage, firewalls, switches, wireless access points and power protection equipment.

Label equipment by user or destination so it reaches the right desk or room. Record serial numbers and photograph important cable connections. Confirm who will pack, transport, reconnect and test each item.

Check how staff reach email, files and business applications. If a server is moving, plan the shutdown, transport, restart and any network changes. Cloud applications also need working internet, sign-in access and devices configured for the new office.

An office move can be a sensible time to review older systems, but it does not require a cloud migration. If you are considering one, scope and test it as a separate change. Our Microsoft 365 migration service explains the checks involved.

5. Check backups and prepare staff

Before moving equipment, confirm that important data is backed up and that someone has the access and instructions needed to recover it. Keep the recovery information available if the main server or office network is unavailable. Our backup and recovery page covers planning and testing.

Tell staff when systems may be unavailable, where they should work during the changeover and whom to contact for help. Check that remote workers can sign in and use required applications before the office is disconnected.

Identify business activities that cannot be interrupted, such as payroll, scheduled reporting or customer bookings. Plan the move around those activities and agree what happens if a service is not ready on time.

6. Agree the moving-day sequence

Use a written run sheet with named contacts for IT, the removalist, building management, the internet provider and any other suppliers involved.

  1. Confirm access to the new site and that the agreed connection and fit-out work is ready.
  2. Check recent backups and notify staff before shutting down affected systems.
  3. Shut down, label and pack equipment in the agreed order.
  4. Transport equipment securely and check it against the inventory on arrival.
  5. Reconnect the network and required systems, then set up desks and shared equipment.
  6. Run the agreed tests and record any remaining issues before handing the office back to staff.

Keep administrative credentials out of the general move schedule. Arrange authorised technical access separately using your normal secure process.

7. Test the work your staff actually do

A working internet speed test is only one check. Have representative staff test the applications and equipment they depend on, including:

  • Signing in to a computer and Microsoft 365.
  • Sending and receiving email, including scanner-generated email where used.
  • Opening, saving and sharing business files.
  • Using the main business applications and any links between them.
  • Making and receiving calls, including call queues and forwarding.
  • Printing and scanning from the desks that need access.
  • Joining a meeting with working audio, video and room equipment.
  • Using wireless across the office and authorised remote access from outside it.
  • Confirming that backups, monitoring and security alerts are reaching the responsible team.

Log issues with an owner and priority. Agree who will be available during the first working day to help staff and resolve anything missed during testing.

Office move IT checklist

Record an owner, due date and status for each item
StageWhat to confirmWho to involve
New premisesConnection availability, cabling, power, equipment locations and building access.Business contact, IT team, landlord and fit-out trades.
Internet and phonesOrders, activation dates, number arrangements, dependencies and fallback options.Internet and phone providers, IT team and specialist suppliers.
Before the moveInventory, labels, backups, staff communication and shutdown plan.IT team, staff and removalist.
Moving dayAccess, secure transport, reconnection sequence and supplier contacts.Move coordinator, IT team and removalist.
Before staff returnBusiness applications, files, calls, printing, meetings, backups and security checks.IT team and representative users.
After the moveOpen issues, updated documentation, supplier records and cancellation of services no longer required.Business contact, IT team and service providers.

Common questions about office IT moves

How early should IT planning start?

Start while assessing the new premises. The time needed depends on connection availability, building work, supplier schedules and the systems being moved. Confirm those dependencies before choosing a cutover date.

Can we move without downtime?

Some disruption may be needed when equipment or connections change. Preparing the new site in advance and testing remote-working arrangements can reduce the impact. Agree the likely interruption and fallback plan for your environment.

Should we replace equipment during the move?

Review condition, warranty, performance and compatibility first. Some replacements may simplify the move; other changes may be better handled separately so there are fewer things to troubleshoot at once. Our Reducing IT Costs guide includes equipment planning.

Planning an office move in Sydney?

Adroit Support is based in Eastwood and has supported Sydney businesses since 2010. We can scope the IT work for your move, including network and device setup, Microsoft 365 access, communications and testing, with responsibilities agreed alongside your other suppliers.

Tell us your current and proposed locations, approximate staff count, intended move date and the systems you depend on. We will help identify the work and dependencies to plan before moving day.

Discuss your office move Call 02 8203 4577

Related: managed IT services · business communications · IT guides.